Kane County Development Committee met Dec. 15.
Here is the agenda provided by the committee:
1. Call to Order
2. Approval of Minutes: November 17, 2020
3. Monthly Financials
A. November Development Committee Financial Reports (attached)
4. Public Comment
5. Building & Zoning Division
A. Building & Zoning Report
B. Zoning Petitions
Petition #4563 SUGAR GROVE TOWNSHIP
Petitioner: Morningstar Community Church
Location: 39W753 Prairie Street, Sugar Grove Township (14-25-100-030)
Proposed: Rezoning a portion of the property from E-1 District Estate Residential to E-3 District Estate Residential to allow the existing home to be sold off separately
2040 Plan: Resource Management
Objectors: None
Recommendations: Regional Planning Comm.: N/A
Zoning Board: Approval with the following stipulations:
1. Home’s well and septic system have to be completely enclosed with new parcel formed for home separation
into a separate parcel – no shared well or septic allowed in creating a new parcel.
2. Water Resources will require an inspection and maintenance report for the detention facilities on site. Any deficiencies in volume or function of the basin will need to be corrected under the requirements of the County’s Stormwater Ordinance Article IX – Long Term Maintenance and Article XI– Enforcement and Penalties.
3. Water Resources will require all floodplain and stormwater facilities to be recorded in Drainage/Conservation Easements.
Development Committee: To be determined
Petition #4564 KANEVILLE TOWNSHIP
Petitioner: Michael Vondra (M-Wave Networks, LLC)
Location: Located at on the west side of Lorang Road, approximately ¼ mile north of Seavey Road, Kaneville Township (10-25-400-001)
Proposed: Special Use in the F-Farming District to allow for the construction of four private communications towers
2040 Plan: Resource Management / Agricultural
Objectors: None
Recommendations: Regional Planning Comm.: N/A
Zoning Board: Approval with the following stipulations:
1. Approval from the Township Highway Commissioner that all cranes, work equipment, etc are allowed on this section of Lorang Road
2. Coordinating with the Township Highway Commissioner, that the petitioner shall install a stabilized construction entrance on site, during the course of construction. If the commissioner wishes, I can supply details of those requirements.
3. The petitioner must coordinate the location access point with the Township Highway Commissioner.
4. The petitioner shall dedicate or prove out prior dedication of 33 feet of right of way, from centerline of Lorang Road to the right of way line, dedicated to the Township.
5. A stormwater permit will be required for the proposed development. A drain tile investigation will be required to be submitted as part of the stormwater permit. Should the site introduce more than 25,000 sq ft of impervious stormwater detention will be required. Outfall from any detention facility must have a viable outfall as defined by the County’s Stormwater Ordinance. The site contains depression areas, this depressional storage must be preserved.
Development Committee: To be determined
6. Planning & Special Projects
A. Staff Report (attached)
7. Subdivision
8. Environmental Resources
9. Water Resources
A. Resolution: Amending the Fiscal Year 2020 Budget for Environmental Management
B. Presentation: Plank Road Cost Share
10. Office of Community Reinvestment
A. Resolution: Amending the FY2021 Budget for Special Revenue Fund 415 to Accommodate Emergency Solutions Grant Funding from the Illinois Department of Human Services
11. New Business
12. Reports Placed On File
13. Executive Session (If Needed)
14. Settler's Hill End Use Update
15. Adjournment
http://kanecountyil.iqm2.com/Citizens/FileOpen.aspx?Type=14&ID=2805&Inline=True