Kane County Development Committee met Oct. 20.
Here is the agenda provided by the committee:
1. Call to Order
2. Approval of Minutes: September 15, 2020
3. Monthly Financials
A. September Development Committee Financial Reports (attached)
4. Public Comment
5. Building & Zoning Division
A. Building & Zoning Report
B. Zoning Petitions
Petition #4559 BIG ROCK TOWNSHIP
Petitioner: Thomas & Joan Patterman
Location: 46W428 & 46W250 Wheeler Road, Section 11, Big Rock Township (13-11-400-005 & 13-11-400-006)
Proposed: Rezoning from F-District Farming to F-1 District Rural Residential
2040 Plan: Agricultural
Objectors: None
Recommendations: Regional Planning Comm.: Not Applicable
Zoning Board: Approval with the following stipulation:
1. Ensure that with the reconfiguration of parcel the entire well and septic system included with the residence.
Development Committee: To be determined
Petition #4560 BLACKBERRY TOWNSHIP
Petitioner: Rick & Mary Thielen
Location: 44W080 Seavey Road, Section 29, Blackberry Township (11- 29-351-029)
Proposed: Rezoning from F-1 District Rural Residential to E-1 District Estate Residential
2040 Plan: Rural Residential
Objectors: None
Recommendations: Regional Planning Comm.: Not Applicable
Zoning Board: Approval with the following stipulations:
1. Development as defined by the Kane County Stormwater Management Ordinance on the resulting F1 and E1 parcels that singularly results in greater than 5,000 sq ft of new impervious area, or cumulatively (as of Jan 1, 2002) results in greater than 25,000 sq ft of new impervious area shall provide Stormwater Management Measures as required by the Kane County Stormwater Ordinance. If the total new impervious exceeds 25,000 sq ft , all lot and parcel owners shall jointly cause the design, permitting and construction of a Detention Storage Facility and off-site outfall (if required) that will store and release runoff from the new impervious areas. The lot and parcel owners will develop and implement a maintenance plan for the Detention Storage Facility, record an easement over the Detention Storage Facility and establish a Special Service Area for said Detention Storage Facility (and off-site outfall – if required). The building permit for the Development that results in the exceedance of the 25,000 sq ft of new impervious area will not be released until a Stormwater Management Permit is issued for the Detention Storage Facility as outlined above. (Please note that the house and any impervious area existing prior to 2002 located will not be considered towards the trigger for Stormwater Detention.)
2. The depth of a basement and height of the first floor for any new construction will be limited by the water table and the BFE, which includes the HWL of any Detention facilities. (Please note that given these parameters a basement may not be possible at this location.)
Development Committee: To be determined
6. Planning & Special Projects
A. Staff Report (attached)
7. Subdivision
8. Environmental Resources
9. Water Resources
A. Presentation: 2020-002 Oak Ridge Farm Cost-Share
10. Office of Community Reinvestment
11. Settler's Hill End Use Update
12. New Business
13. Reports Placed On File
14. Executive Session (If Needed)
15. Adjournment
http://kanecountyil.iqm2.com/Citizens/FileOpen.aspx?Type=14&ID=2763&Inline=True